Flexcon · 2 days ago
Project Engineer - Elkton, KY Onsite
Flexcon is currently seeking candidates to fill a Project Engineer Role. The Project Engineer is responsible for providing manufacturing with engineering support by installing new systems, maintaining and improving existing systems throughout the company.
ElectronicsGraphic DesignPlastics and Rubber Manufacturing
Responsibilities
Design components, systems and/or facilities utilizing a computerized drafting system
Work on assigned engineering requests; gather information and make recommendations; obtain quotes; supply specifications for equipment; obtain approval and purchase materials; schedule and supervise project installation; evaluate and monitor completed projects
Update procedures and instructions, as needed
Maintain appropriate files
Document project status in the computer system
Evaluate and review bids from prospective contractors
Issue contracts to contractors
Provide technical assistance to manufacturing personnel
Comply with federal and state regulations; enforce procedures, rules and regulations to maintain a safe and clean work environment
Other duties consistent with the general nature and focus of the position and/or the goals and objectives of the department may be assigned
Qualification
Required
4 year Engineering Degree
3-5 Years web handling/converting background and/or industrial ventilation experience a plus
5+ years experience in a similar role
Benefits
Healthcare coverage (medical, dental, and vision)
Life and disability insurance
401(k) with company match
Paid time off
Wellness programs
Tuition assistance
Company
Flexcon
FLEXcon unique is their relentless pursuit of the right coated and laminated film or adhesive for each and every application.
H1B Sponsorship
Flexcon has a track record of offering H1B sponsorships. Please note that this does not
guarantee sponsorship for this specific role. Below presents additional info for your
reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (2)
Funding
Current Stage
Late StageRecent News
2025-07-28
Worcester Business Journal
2024-04-24
Company data provided by crunchbase