Technician - Assembly & Integration II- All Levels - All Shifts (Evergreen) jobs in United States
cer-icon
Apply on Employer Site
company-logo

Blue Origin · 9 hours ago

Technician - Assembly & Integration II- All Levels - All Shifts (Evergreen)

Blue Origin is working to develop reusable, safe, and low-cost space vehicles and systems for the benefit of Earth. The Technician - Assembly & Integration II role involves providing tactical and technical support to Engineering and Production by performing activities related to the assembly and testing of electro/mechanical systems for spaceflight applications.

AerospaceManufacturingNational SecurityRenewable Energy
badNo H1BnoteU.S. Citizen Onlynote

Responsibilities

Precision assembly of rocket engine components: combustion devices, valves, turbomachinery, avionics, test
Root cause and diagnostic component disassembly, repair, and work
Hydraulic testing for valve actuation
Nitrogen and Helium leak testing
Preparation for environmental testing
Hydro proof structural testing of components
Detailed component inspection to tolerances of 0.0001in
Creating and maintaining strict cleanliness requirements (liquid/gaseous oxygen compatibility)
Support the design, procurement, installation, and integration of custom manufacturing and test equipment
Help maintain inventory of tooling and equipment
Safely work with hazardous systems, chemicals, and high-pressure operations
Define how to prepare hardware for test, qualification, and flight
Identify, develop, and deploy new manufacturing methods (or refine existing) to improve quality, reduce cost, and optimize build schedule
Support DFMA and PFMEA studies to strengthen the feedback loop between design, build and test
Support the development of manufacturing work instructions to clearly define the following manufacturing processes: receiving inspection, fabrication, assembly, test, and integration, and refurbishment
Identify non-conformances and escapes, support and deploy corrective actions

Qualification

Valve assembly experienceTurbomachinery assembly experiencePrecision assemblyEngineering drawing interpretationProcess developmentTechnical software skillsCommunication skillsTeam collaborationProblem-solving skills

Required

1-8 years of direct valve, turbomachinery, or engine assembly experience
Mastery of precision and tight tolerance assembly
Strong ability to interpret engineering drawings
Extensive experience reading and understanding specification and detailed work instructions
Proven experience and successful track record developing new processes
Strong written, personal, technical, and software skills (CAD, Scheduling, Issue Tracking, Excel, Word, PowerPoint, Outlook, etc)
Ability to communicate clearly and appropriately at all levels of the organization
Ability to earn trust, maintain positive and professional relationships, and contribute to a culture of inclusion
Must be a U.S. citizen or national, U.S. permanent resident (current Green Card holder), or lawfully admitted into the U.S. as a refugee or granted asylum
Physical Requirements: Climb ladders and stairs, Lift and carry 50 lbs. for limited durations, Work schedule may vary and depend on hardware and testing, Remain flexible by working overtime and weekends (when necessary)
Able and willing to travel for work related matters 5% during the year

Benefits

Medical
Dental
Vision
Basic and supplemental life insurance
Paid parental leave
Short and long-term disability
401(k) with a company match of up to 5%
Education Support Program
Paid Time Off: Up to four (4) weeks per year based on weekly scheduled hours, and up to 14 company-paid holidays.

Company

Blue Origin

company-logo
Blue Origin is an aerospace company that focuses on lowering the cost of spaceflight and helping to explore the solar system.

Funding

Current Stage
Late Stage
Total Funding
$185.35M
Key Investors
NASAUnited States Space Force
2024-02-20Secondary Market
2024-01-24Undisclosed· $18M
2021-12-03Grant· $130M

Leadership Team

leader-logo
David Limp
Chief Executive Officer
linkedin
leader-logo
Tim Collins
Vice President Supply Chain
linkedin
Company data provided by crunchbase