System Integrator Engineer jobs in United States
cer-icon
Apply on Employer Site
company-logo

Qualitest · 4 hours ago

System Integrator Engineer

Qualitest is seeking a skilled System Integrator Engineer to join our team. In this role, you will work closely with the User Studies team to support, troubleshoot, and maintain our high-performance capture systems. The ideal candidate will possess a strong foundation in hardware and software troubleshooting, Linux systems administration, and mechanical/electrical engineering.

ConsultingEnterprise SoftwareInformation ServicesInformation TechnologyOutsourcingQuality AssuranceSoftwareTest and Measurement
check
H1B Sponsor Likelynote
Hiring Manager
Simran K.
linkedin

Responsibilities

Troubleshoot and maintain capture systems to ensure optimal performance
Identify and resolve component bugs and system-level issues
Support system upgrades and assist in equipment assembly
Analyze recurring failures and develop long-term solutions
Document technical processes and communicate updates clearly
Set up and dismantle equipment for pilot projects
Collect and analyze data to verify component and system performance

Qualification

Linux system administrationTroubleshooting hardware/softwareMechanical/electrical engineeringPowerShell scriptingCAD designSoldering experienceScripting knowledgeVR systems familiarityEffective communicationProblem-solving abilities

Required

Proficiency in Linux system administration and command-line tools
Experience with PowerShell scripting and editing JSON configuration files
Strong understanding of mechanical and electrical engineering assembly processes
Excellent troubleshooting skills across integrated hardware and software systems
Effective communication and problem-solving abilities
Bachelor's degree in Engineering or equivalent experience

Preferred

Familiarity with VR systems and optical, camera, and audio equipment setups
Experience with CAD design for mechanical components
Scripting knowledge in Python, JavaScript, or Bash
Hands-on soldering experience (through-hole and surface mount)
Understanding of performance-critical system design and optimization

Company

Qualitest

company-logo
Qualitest is the world’s leading managed services provider of AI-led quality engineering solutions.

H1B Sponsorship

Qualitest has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (12)
2024 (36)

Funding

Current Stage
Late Stage
Total Funding
unknown
2019-07-10Acquired

Leadership Team

leader-logo
Andrew Duncan
Chief Executive Officer
linkedin
leader-logo
Lihi Segev
Executive Vice President
linkedin
Company data provided by crunchbase