Senior Data Center Electrical Engineer jobs in United States
cer-icon
Apply on Employer Site
company-logo

CoreWeave · 11 hours ago

Senior Data Center Electrical Engineer

CoreWeave is The Essential Cloud for AI™, providing a platform that enables innovators to build and scale AI with confidence. The Senior Data Center Electrical Engineer will lead the design and delivery of electrical infrastructure for data center facilities, ensuring systems meet high standards of performance and efficiency.

AI InfrastructureArtificial Intelligence (AI)Cloud ComputingCloud InfrastructureInformation TechnologyMachine Learning
badNo H1BnoteU.S. Citizen Onlynote

Responsibilities

Execute electrical engineering design tasks for new data center facilities, including build-to-suit, self-performed, and tenant fit-out projects
Develop electrical design solutions that enhance speed of deployment, scalability, and repeatability for hyperscale data center sites
Contribute innovative design concepts and technical approaches to improve efficiency, reliability, and constructability
Support whitespace fit-outs by developing electrical layouts, validating load capacities, coordinating with IT/operations, and ensuring compliance with company standards
Participate in new site due diligence, including evaluation of utility availability, site power constraints, and electrical infrastructure readiness
Review electrical striping plans to verify that loads are properly distributed upstream, ensuring balanced operation under normal and failover conditions
Review design drawings, specifications, and shop drawings prepared by consultants and contractors to ensure compliance with Basis of Design and company standards
Coordinate closely with third-party consultants, vendors, and internal project teams (IT, operations, mechanical, and project management) to ensure complete and cohesive designs
Perform technical calculations and studies (short-circuit, coordination, arc-flash, load flow, etc.) to validate system performance and safety
Ensure compliance with industry codes, standards, regulations, and safety protocols throughout the design and construction process
Participate in factory witness testing, site inspections, and commissioning activities to verify proper installation and operation of electrical systems
Provide technical input on budgets, schedules, and resource planning in support of project execution
Support troubleshooting and corrective action efforts related to electrical design and implementation
Contribute to a culture of innovation, collaboration, and technical excellence within the engineering team

Qualification

Electrical EngineeringData Center DesignElectrical Systems KnowledgeTechnical CalculationsProject ManagementAnalytical SkillsInnovationProfessional CertificationsCommunication SkillsProblem-Solving SkillsCollaborationAdaptability

Required

Bachelor's degree in Electrical Engineering
7+ years of experience in data center engineering
Proven track record of successfully completing data center design projects
Strong knowledge of data center electrical systems, such as Substations, Emergency Generators, Uninterruptible Power Systems (UPS), Lithium-Ion Battery Plants and Fire Alarm
Be familiar with Emergency Power Monitoring Systems (EPMS) and/or Supervisory Control and Data Acquisition (SCADA) Systems with the ability to develop controls sequences and monitoring protocols
Experience with large-scale, high-density data centers and cloud infrastructure
Excellent communication and project management skills
Ability to work effectively in a fast-paced, dynamic environment
Strong problem-solving and analytical skills
Applicants must have work authorization that does not require sponsorship from the company now or in the future

Preferred

Professional Engineering license preferred
Professional certifications (e.g., Uptime Institute, BICSI, or similar) are a plus

Benefits

Medical, dental, and vision insurance - 100% paid for by CoreWeave
Company-paid Life Insurance
Voluntary supplemental life insurance
Short and long-term disability insurance
Flexible Spending Account
Health Savings Account
Tuition Reimbursement
Ability to Participate in Employee Stock Purchase Program (ESPP)
Mental Wellness Benefits through Spring Health
Family-Forming support provided by Carrot
Paid Parental Leave
Flexible, full-service childcare support with Kinside
401(k) with a generous employer match
Flexible PTO
Catered lunch each day in our office and data center locations
A casual work environment
A work culture focused on innovative disruption

Company

CoreWeave

twittertwittertwitter
company-logo
CoreWeave is a cloud-based AI infrastructure company offering GPU cloud services to simplify AI and machine learning workloads.

Funding

Current Stage
Public Company
Total Funding
$24.87B
Key Investors
Jane Street CapitalStack CapitalCoatue
2025-12-08Post Ipo Debt· $2.54B
2025-11-12Post Ipo Debt· $2.5B
2025-08-20Post Ipo Secondary

Leadership Team

leader-logo
Michael Intrator
Chief Executive Officer
linkedin
leader-logo
Brannin McBee
Founder & CDO
linkedin
Company data provided by crunchbase